Installation process of big shaft bearing of oil press machine?
The installation process of big shaft bearing of oil press machine is as follows: Thorough cleaning: before installation, it is necessary to remove the main shaft and upper cage of the oil press, and polish the outer and inner surfaces of the press screw and the screw feeder with an emery cloth. Lubrication: Add grease to all parts of the oil press that need lubrication, especially the lubricating oil in the gear box, the varieties and grades should be in accordance with the requirements of the manual. Arrangement of round rows: When installing the machine, the round rows of the oil press after polishing should be arranged according to the original position, and then pressed with the compression nut, and the degree of compression should be appropriate for the disc to be able to wriggle when squeezing oil. Fixed installation: Fix the treated oil press on the foundation with foot bolts. When installing, pay attention to the pulley of the motor should be aligned with the pulley of the oil press, and the position is moderate, the direction of rotation is correct, and the elasticity of the transmission belt should be adjusted appropriately. Inspection and debugging: After the installation is completed, inspection is needed. Check whether the bearings are full of lubricant, turn the pulley, listen to the transmission parts between the impact or other noises. If there is no noise, the machine can be turned on. Emphasis on checking whether the machine is installed correctly, whether the connecting pipes and pieces are firm and safe. Then debugging, so that the machine is in a normal working condition. Before starting the machine formally, check the parts for looseness and damage. Adjust the clearance between the spiral shaft and the cake outlet ring by first making the spiral shaft forward against…